Contact
France

Cleaning cooling towers during a production shutdown

Mechanical cleaning of 4 cells and 2 tanks (hot and cold water)
Download PDF

Cleaning cooling towers during a production shutdown

France

During the periodic shutdown of part of its plant, our client contacted CTP environnement for the complete cleaning of facilities in which the method used could no longer be sustained because of changes to regulations.

As a result, CTP environnement proposed a solution, which involved carrying out the following two distinct operations:

image

CTP environnement provided the human and physical resources needed to fulfil the client’s requirements, especially in terms of schedule. Three teams of seven people worked on site for four days. Some team members were entrusted with cleaning the cells (internal and lower sections) while others worked in clearing and drying the two tanks:

image

Excellent cooperation and responsive communication between the various people involved allowed this service to be provided by the deadline with satisfactory results. This trial project was successfully repeated two years later on another unit’s cooling tower where sludge dewatering using a geotextile membrane was a huge success.

News
22nd September 2025
POLLUTEC 2025

We will soon be exhibiting at Pollutec, stand H4-B095.

A leading showcase for environmental innovation, with 45 years of expertise and 11 sectors covering all environmental issues, the exhibition highlights all the technologies, solutions and equipment dedicated to the prevention and treatment of all forms of pollution and works to preserve the environment and implement sustainable development.

More
News
29th September 2025
ENERH2O 2025

We exhibited for the first time in the ENERH2O on September 24 & 25th, Portugal’s leading energy and water exhibition. This third edition presented the latest solutions and innovations for the management and use of these essential resources, with a focus on energy efficiency, renewable energy production, and sustainable water management.

More
News
10th June 2025
New Logistics Hub in St-Quentin-Fallavier, France

Our Supply Chain department has moved to a new site in St-Quentin-Fallavier (38), bringing together our fleet of mobile units and water & air treatment equipment.

A new warehouse designed to support our growth and improve the working conditions of our teams.

More