CTP environnement answered to a a request for remediation tests of drilling water using physico-chemical and biological treatment.
A test campaign has been realised beforehand to define the optimum economical duration of use of the bioreactor, to choose the final flow of 5 m3/h (18 gpm).
The 3 mobile units designed (DAF, MBBR and UF+RO Pilot) by our Engineering and Design Department has been operated for 11 months and will be reused for other projects.